5. Commissioning, operation
5.3 Operation
Once the controller has been installed in the control panel and wired up, it should be
commissioned as follows:
Switch on the power supply for the controller.
Once the power supply has been switched on, the input configuration is displayed on the
EN
actual value display (PV display) for about 3 seconds and, on the set point display, the
assigned end value can be seen.
During this time, all outputs and control displays are switched off.
Subsequently, the actual value display will show the current measured value, the set
point display will show the selected set point (SV1 or SV2) and it will start to control.
(Should the monitoring output be turned off, [OFF] will be shown on the actual value
display. In order to turn the monitoring output back on again, the
pressed for approx. 1 second.)
Input of the setting parameters
To enter one or more setting parameters, follow the procedure in chapter 6
"Configuration".
20
WIKA operating instructions models CS6S, CS6H, CS6L
/
button must be
ON
OFF

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cs6hCs6l

Inhaltsverzeichnis