Herunterladen Inhalt Inhalt Diese Seite drucken

OEG KSF-Pro Handbuch Seite 7

Kesselschaltfeld
Vorschau ausblenden Andere Handbücher für KSF-Pro:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Heat accumulator .......................................................................................................57
Control of the heat pump ............................................................................................58
Pump for return-pipe temperature increase (bypass pump) .......................................58
Domestic hot water .....................................................................................................58
Domestic hot water circulation ...................................................................................60
Remote heating activation ..........................................................................................60
Operation of heating systems with two heat sources .................................................60
Setting the minimum RPM for pump R9 .....................................................................63
Differential controller ..................................................................................................64
Operation modes in cases of sensor malfunction ......................................................66
Controller installation ...........................................................................................................67
Wall installation ...........................................................................................................67
Panel installation ........................................................................................................68
Installation onto boiler ...............................................................................................69
Electric connection of the controller ...........................................................................70
Connection of temperature sensors ...........................................................................71
Room unit DD2+ .........................................................................................................72
BUS connection to WHMS controllers ........................................................................73
Installation and connection of VT safety limiter ..........................................................74
Burner connection ......................................................................................................75
Installation and test of the safety temperature limiter STB .........................................76
Controller malfunction..........................................................................................................77
Sensor simulation and controller operation test .........................................................77
Controller failure and servicing ...................................................................................77
Technical data......................................................................................................................78
Declaration of conformity .....................................................................................................79
Warranty ..............................................................................................................................80
Disposal of old electrical and electronic equipment.............................................................80
Hydraulic schemes ............................................................................................................399
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis