Example:
On Monday morning at 9:00 o'clock any cultures have
to be ready. The program (Step 1 ... Step 4) for the
production of these cultures needs altogether 36 h. So
the program must be started manually without use of
the "Pre-step" on Saturday evening at 7:00 o'clock.
The "Pre-step" makes it possible to choose any time for
the start and to keep the material cooled under the
desired conditions.
Programm 01
Speed/ Duration
Pre-Step
Step 1
Step 2
Step 3
Step 4
Fig. 33: Example for programming
28
All manuals and user guides at all-guides.com
Temperature [°C]
[h]
on
20
7
30
10
40
20
10
1
10
Drehzahl [1/min]
Light (ILLUM)
0
200
100
60
200
Cooling
off
on
on
on
off
off
on
on
on
on