Functions
Setting the current of the post-meter fuse
The post-meter fuse is designed for a certain current level. In order to calcu-
late the charging current, the current of the post-meter fuse must be set via
the DIP switches in the connection panel of the charging station. If the
charging station does not find an external meter when the Modbus TCP
function is activated, or if the connection to the external meter is interrupted,
the charging current is reduced to 10 A. This is indicated on the LED bar by
orange breathing of the first two segments.
The setting must be made on the DIP switch DSW1. The following DIP
switches can only set a maximum value that is less than or equal to the cur-
rent of the post-meter fuse.
DSW1.4 to DSW1.5
Information
Changes to the DIP switch settings only become effective after a restart of
the charging station!
To restart, press the "Service button" until the first signal tone sounds (ap-
prox. 1 second) or switch off the charging station for a short time via the
line circuit breaker.
86
Current
25 A
35 A
50 A
63 A
xChargeIn M Series
Figure
Configuration manual V1.04