post-meter fuse) defined by DIP switches, the charging station can regulate
the charging current in such a way that the maximum energy reference
never exceeds the value of the post-meter fuse value.
5.5.1
Connection
When connecting external meters please note the following:
5.5.2
Supported meters
The following meters can be read out by the charging station using a Janitza
ProData 2 data logger.
ABB
B-control
Herholdt
Janitza
Janitza
Siemens
The following meters can be read out directly by the charging station using
Modbus TCP.
B-control
B-control
Information
Detailed information about the meter installation can be found in the instal-
lation instructions of the meter manufacturer.
5.5.3
Settings
The Modbus TCP feature is disabled by default. If an external meter with a
Modbus TCP network interface was installed in the system, it must be con-
figured in the web interface in advance.
Configuration manual V1.04
© EATON
The connection is made via the Ethernet1 connection X4 (LSA+
this, the meter must be in the same network as the charging station.
The meter must be connected with the same phase sequence as the
charging station, so that the house load calculation and the charging op-
timization are carried out correctly. If it is necessary to connect the
charging station beginning with phase 2 in order to better distribute the
phase loads, the meter must also be connected beginning with phase 2.
Manufacturer
Manufacturer
Model
B23 312-100
EM300
ECSEM113
B23 312-10J
ECSEM114MID
7KT1260
Model
EM300 LR
EM300 LRW
Functions
®
). For
85

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis