Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Standard Signal (Ma); Installing The Metering Lock - ECOLAB Elados EMP III E60 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Elados EMP III E60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.2.3.2 Installing the standard signal (mA)

WARNING

8.2.3.3 Installing the metering lock

NOTE
417101441_EMP_III_E60.docx
Observe correct polarity during connection!
The metering lock function must be activated in menu first. (see chapter:
"configuration metering lock") The metering lock is available in all operation modes.
4
+
5
= Standard signal input
0/4 – 20 mA
PIN
Assignment
4
0/4-20 mA (-)
5
0/4-20 mA (+)
Fig. 8.11 Installing the standard signal (mA)
3
+
4
= Metering lock input with potential-free
contact
PIN
Assignment
3
Relay input
GND (┴)
4
1 +3
+
4
= Metering lock input with electronic
switch (NPN)
PIN
Assignment
1
5 V, DC
3
Relay input
GND (┴)
4
Fig. 8.12 Installing the metering lock
- 91 -
10.3.7
Rev. 12-08.18

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iii e60 plus

Inhaltsverzeichnis