10.4.3.1 Preparation

The volume of the measuring cylinder should be 1/50 of the metering pump rate in litres/h.
During this process, the suction tube must not change its position.
NOTE
The calibration of the metering pump is only valid for the currently set stroke length setting.
After changing the stroke length, the calibration must be performed again.

10.4.3.2 Calibration / Start

Fig. 10.48 Calibration / Start
to
The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
The oval gear meter pulses (OGM pulses) are counted upwards from 0.
By activating the 'Menu/Exit' function, the running calibration can be interrupted.
NOTE
If the OGM pulses are not displayed, check all the connections to the pump!
to
: After the running process, the amount removed from the measuring cylinder
417101441_EMP_III_E60.docx
Fig. 10.47 Calibration /pump with oval gear meter (OGM
 Connect the pump ready for operation on the pressure
 Fill a suitable measuring cylinder and insert the
(see chapter
10.4.2.1
This quantity is then entered as the calibration value (in ml or l).
side (see section
7
suction line.
"Preparation") must be read off.
Fig. 10.49 Calibration / Start: calibration process
During the calibration process, the oval gear pulses
determined appear on the display.
- 112 -
PLUS
): Preparation
"Installing the device").
Rev. 12-08.18

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iii e60 plus

Inhaltsverzeichnis