Herunterladen Inhalt Inhalt Diese Seite drucken

Plus In The Pump Software; Deactivating Of Dongle Box Respective Ogm; Trouble Shooting - ECOLAB Elados EMP III E60 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Elados EMP III E60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12.2.1
Deactivating of
The following procedure is applied to re-disable a peripheral unit
which had previously been connected and has then been removed again, in the pump
software.
Cancel the alarm signal which appears by pressing the Start/Stop button.
The following appears in the display unit:
Fig. 12.13 Operating faults: Deactivating of DongleBox in the pump software 1
Deactivation can be selected by pressing the  or button and following is displayed
Fig. 12.15 Operating faults: Deactivating of DongleBox in the pump software 2
 The setting is taken over through pressing the Start/Stop button
12.2.2

Trouble shooting

Fault
metering pump does not
work, no display indicator
pump has no suction
despite venting and max.
strokes
metering head is leaky,
medium escapes from the
diaphragm breakage outlet
low-level indicator
appears on the display
despite a full container
CAUTION
Electronics repairs must only be performed by trained electricians, following the safety
regulations of the professional association VB G 4 and ZH 1/11)!
CAUTION
Before calibration, maintenance, repairs or replacement of parts, the device must be
disconnected from all voltage sources if it is necessary to open up the device.
417101441_EMP_III_E60.docx
Dongle Box
respective
Dongle-Box
Dongle-Box
Possible cause
mains power cable damaged
incorrect voltage
deposits, adhesions or drying-out
of the valves
metering head is loose
diaphragm is torn
float of the suction pipe is jammed
suction pipe plug or strapping plug
is loose or not plugged in
suction pipe cable is faulty
Prior to repair and maintenance work and metering of dangerous media, always rinse the
metering head, relieve the pressure pipe and wear protective clothing (protective goggles,
gloves and apron).
When opening the covers or removing parts, except when this is possible without tools,
voltage-carrying parts may be exposed. Connection points may also be under live
voltages.
PLUS
OGM
in the pump software
Fig. 12.14 Operating faults: Deactivating of OGM
Fig. 12.16 Operating faults: Deactivating of OGM
Remedy
change mains power cable
check mains voltage
rinse the metering head through the
suction line, if necessary remove and
clean or replace the valves
screw in the metering head fastening
screw diagonally
replace the diaphragm
unjam the float
tighten the plug, clean the contacts,
check whether the strapping plug is
plugged in
replace the empty report device
- 119 -
PLUS
(dongle
box,
OGM
PLUS
OGM
PLUS
in the pump software 1
PLUS
OGM
PLUS
in the pump software 2
Rev. 12-08.18
),

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iii e60 plus

Inhaltsverzeichnis