Upgrading the EMP III E60 to the EMP III E60
8
To upgrade the
obtain the
dongle box
The
dongle box
measuring the metering rate. If the
pump off and then on again, "E60+" appears on the bottom left of the pump's display unit. If

PLUS

an
OGM
switching the pump off and then on again, "E60++" appears on the pump's display unit, and
the oval gear meter function is automatically enabled under Configuration in the Pump
menu.
If the pump software recognises that there is a
communication is then interrupted between the pump and the peripheral unit (through the
removal of the unit, for example), an error message is displayed (refer to section
"Alarm signals (Display)"). To prevent this error message appearing repeatedly, the
communication (connection) must be restored, or the analysis must be disabled in the pump
software (see section
8.1

Fitting the dongle box

Fig. 8.1
Fitting of the Dongle-Box 1
Fig. 8.2
Fitting of the Dongle-Box 2
NOTE
417101441_EMP_III_E60.docx
EMP III E60
to the
from our range of accessories.
is a slot extension, as well as a means of connecting an oval gear meter for
(oval gear meter) is connected to slot V on the dongle box and is activated by
12.2.1
"Disabling a
Pos.
Description
V
Input for oval gear meter
Fixed connector cable for connecting the pulse input to the EMP pump
VI
(input II)
1
Connection lead for connection to input II of the pump
2
Dongle box
VII
Input for batch pulse and metering lock
VIII
Input for pulse, standard signal input and metering lock
Fig. 8.3
If, before upgrading with a dongle box, a plug is connected to the input for pulse / standard
signal (see Fig. 8.2, Pos. 1), then this plug can be connected after the upgrade to plug VIII
(see Fig. 8.1, Pos. VIII) of the dongle box.
PLUS
EMP III E60
and thus access the additional functions,
dongle box
is fitted and is activated by switching the
dongle box
dongle box
or
OGM
Fitting of the Dongle-Box 3
- 87 -
PLUS
PLUS
or
OGM
connected, and the
PLUS
in the pump software").
 Fit the dongle box (Fig. 8.1) to
the rail of the EMP pump
provided for this purpose
(Fig. 8.2, Pos. A):
 Slide the dongle box (Fig. 8.1)
onto the rail on the left side of
the EMP pump (Fig. 8.2, Pos.
A), until it snaps into place.
 Connect the connection cable
(Fig. 8.1, Pos.
3
and 8.3, Pos. 2)
to the input for pulse / standard
signal (Fig. 8.2, Pos. 1).
 Switch the pump off and afresh
on.
The additional functions in the
metering pump electronics can thus
be activated and executed.