HEYLO K 120 Betriebsanleitung Seite 60

Vorschau ausblenden Andere Handbücher für K 120:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Oil heater K 120 (R) / K 160 (R)
Fig. 20:
Control elements
1 Heating mode ope-
rating light
3 Burner fault signal
lamp
5 Burner operating
hours counter
7 Room thermostat
connections
9 Fan position fault
signal lamp (with
radial fans)
11 Temperature indi-
cator
The device switch turns the device on and off. If
the device switch is switched to position [I], the
heating mode
device operates in
switch is set to position [II], the fan is switched on
and the device operates in
Fault signal lamps are fitted on the control panel
and on the automatic oil combustion machine. The
indicator lights indicate the device's operating
status (see section Safety devices
The temperature indicator shows the current tem-
perature of the air at the blow-out nozzle.
The display of the digital temperature indicator
shows the status lights of the burner and fan
components. The status lights illuminate as soon
as the device component has been switched on.
The reset button on the safety temperature limiter
(STL) resets the STB after a malfunction that has
caused the device to overheat has been rectified.
58 / 85
2 Temperature fault
signal lamp
4 Device switch
6 Fine fuse 6.3 A
8 Power cable
10 Safety temperature
limiter (STL)
. If the device
ventilation
mode.
[
56]).
The operating hours counter displays the burner's
operating hours.
A malfunction in the burner is reset via the reset
button on the burner (rear of the device).
Room thermostat
With the optional room temperature controller, the
device can be operated unattended. The device
then runs in continuous operation until the set
room temperature is reached in heating mode.
16
Transport and
installation
The device has been assembled, set up and tested
at the factory. Therefore there may still be oil res-
idues in the pipes. In random samples, longer test
runs are also carried out, which you can read off
from the operating hours counter. In order to rule
out any life-threatening injuries and damage to
materials during transport and installation, please
observe the following:
– Transport and installation work may only be
carried out by qualified and authorised per-
sons.
– Lifting tackle and slings must comply with the
provisions of the accident prevention regula-
tions.
– When selecting the lifting tackle and slings,
consider the weight of the components and
the centre-of-gravity (seeTechnical details
[
78]).
– Transport routes must be large enough. Door-
ways or gates must be at least 5 cm wider and
higher than the transport unit, including the
means of transport itself.
– Arrange for a third person to secure the
transport route.
– All work on the electrical equipment must only
be performed by qualified electricians.
EN