Oil heater K 120 (R) / K 160 (R)
– The necessary supply of fresh air to ensure
proper combustion must always be guaranteed
(windows, doors or other openings).
The following table shows the amount of fresh air
required depending on the volume of the room and
the heat output achieved.
Heating out-
Volume con-
put [kW]
tent [m³]
25
500
50
1000
80
1400
110
1900
140
2500
160
2800
For installation of the device in closed, well-
ventilated rooms without installed chimney
connection:
– The minimum room size must correspond to
an average heat requirement of 0.058 kW/m³
for the installation room.
– A natural air renewal of 2.5 times the room
content / h is to be ensured in principle (for
the removal of combustion gases and the sup-
ply of fresh air).
At least the following openings are required for
this quantity of fresh air and exhaust air:
– Fresh air: 2.8 m
2
– Exhaust air: 2.8 m
2
The following table shows the required natural air
renewal depending on the volume of the room and
the heat output achieved.
Heating output
Volume con-
[kW]
tent [m³]
25
500
50
1000
52 / 85
Required quantity
of fresh air
[m³/h]
50
80
130
180
220
240
Natural air
renewal [m³/h]
1250
2500
Heating output
Volume con-
[kW]
tent [m³]
80
1400
110
1900
140
2500
160
2800
Outdoor installation of the device
The following principles apply to the outdoor in-
stallation of the device:
– Operation of the device must not cause any
danger or unacceptable nuisance to persons or
animals.
– In residential areas, the locally maximum per-
missible noise emissions must be observed.
– Unauthorised persons must not be able to ma-
nipulate the device or the supply of the device
with energy or oil (fuel).
– For this, the location and the operation must
be protected against access.
– Dirt, rain and snow can be sucked in by the
fan. For this reason, appropriate protection
should be provided where necessary.
Safety clearances
The following minimum distances apply for each
installation room:
lateral to combustible parts
lateral to fuel tank
outlet side to combustible parts
suction line for free air supply
to the top
14.6
Personal protective equipment
Personal protective equipment serves to protect
staff against any hazards that could affect their
safety or health at work.
Natural air
renewal [m³/h]
3500
4750
6250
7000
60 cm
100 cm
200 cm
60 cm
300 cm