13.3.6
Replacement of the Water Fittings
In the event of microbial contamination or to prevent this occurring, the complete pipe
system can be replaced with a new system instead of the time-consuming process of
decontamination on-site.
DG3/III pipe system,
complete
(replacement
subassembly)
Fig. 13.7
Replacement of
the pipe system
subassembly
Lift out the complete pipe system
Installation in reverse order; use new flat seals and a new stainless steel flex tube (enclosed).
Open the angle valve, vent the device and conduct a function test.
417102242_DG_3
Fig. 13.8
Replacement of the water fittings
- 98 -
Item
Description
Coil flat connector
1
Pipe interrupter
2
3
Water meter
4
Lock nuts
Procedure:
Close angle valve.
Unscrew the water supply line and
lower lock nut from the fresh water
inlet.
Remove the flat connector from the
coil (Item 1) of the solenoid valve.
Unscrew the flex hose screw fitting
on the pipe interrupter (Item 2).
Undo the connecting cable from
the water meter (Item 3).
Loosen the lock nuts (Item 4).
Rev.: 02-05.2014