13.3.4
Replacement of the pipe interrupter
13.3.5
Replacement of the water meter
417102242_DG_3
Item
Description
1
Pipe interrupter
2
Threaded nipple
3
Flat seals
Procedure:
Remove the connecting tube (see chapter 13.3.3).
Screw off the pipe interrupter (Item 1).
Clean the threaded nipple (Item 2).
Screw on a new pipe interrupter (Item 1).
Screw on the connecting tube again, using new flat
seals (Item 3).
Start the device and check for leaks.
Fig. 13.5
Replacement of the pipe interrupter
Item
Description
1
Water meter
2
Lock nuts
3
Swivel nuts
4
Flex tube
5
Swivel nut
Procedure:
Unscrew the plug from the water meter (Item 1).
Loosen the swivel nut (Item 5) from the flex tube
(Item 4)
Loosen the lock nuts (Item 2) from the section of pipe.
Loosen the swivel nuts (Item 3).
Pull the section of pipe up and remove the water meters
and seals.
Install the new water meter and new seals in reverse
order.
Start the device and check for leaks.
Fig. 13.6
Replacement of the water meter
- 97 -
Rev.: 02-05.2014