Herunterladen Inhalt Inhalt Diese Seite drucken

COMPANION 27812 Anleitungshandbuch Seite 24

Vorschau ausblenden Andere Handbücher für 27812:
Inhaltsverzeichnis

Werbung

2
1. Frontbeggertube
2. Lowerbaggertube
3. 114x 50,8mm Carriage
Bolts
4.
1/4 Lock nut
1.
2.
5----.... I
Front bagger tube
1/4x 50,8mm Carriage
Bolts
4
3.
1/4 Lock nut
4.
Vinyl Binding
5.
Dump handle tube
6MM (1/4")- 9MM (3/8")
6.
Clevis pin
7.
Retainer spring
8.
Cap
1
1. Top Surfaces Even
2.
Horizontal Adjustment Bracket
3.
Vertical Adjustment Bracket
To Assemble
Bagger
NOTE:
For ease of assembly, you may wish to obtain the
assistance of another person when putting the begger to-
gether.
Holes in front begger tube are at an angle. Place front
bagger tube against lower begger tube and check for
proper hole alignment before assembling bolts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8mm carriage belts and lock nuts supplied.
Tighten securely.
Slide front and lower bagger tube assembly into the beg-
ger assemby.
Assemble front and upper bagger tubes using four (4)
1/4 x 50,Smm carmige belts and lock nuts supplied.
Tighten securely.
Slip all the vinyl bindings over the bagger tubes
Slide the begger dump handle through the hole in the
ba_lger top, install the clevis pin and secure with retainer
spring.
Push cap ever end of bagger dump handle.
NOTE: For future use, the clevispin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces-
sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gapbetween the bagger topand fender and
the bagger top surface should be even with the top surface
of the fender. To adjust bagger position:
Horizontal
adjustment
Slightly loosen the nuts secudng the bagger RH end LH
horizontal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets the amount forward or backward you
wish the bag assembly to move. Retighten the nuts se-
curely.
Vertical
adjustment
Slightly loosen the nuts securing the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger assembly and check the bagger to
fender fit. If necessary, repeat the procedure until prober
fit is attained.
To convert
to begging,
mulching
or discharge
See "Section
5" of this manual.
24

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis