Operating
Instructions
Volume of the pressure system/
PVOL
lines
to be measured
Timer A (time it takes for p1 to be
TimA
reached
after
started)
Leakage measurement
DONE
completed
1.3 Symbols
used
WARNING!
.. indicates a specific or potential hazard. This is intended to protect you against accidents.
Read carefully and follow the warnings!
62
Operating
Instructions
the
measurement
is
has been
I SICK
AMODE
Analog output
MEAS
Leakage measurement
Sensor ready for the leakage
Wait
User
measurement
(waiting for the user to trigger it)
8017612/1DZP
PAC50
mode (dP or dT)
is in progress
to be started
/ 2022-06-23
| PAC50
Subject to change without notice