Herunterladen Diese Seite drucken

instagrid LINK MAX Benutzerhandbuch Seite 26

Vorschau ausblenden Andere Handbücher für LINK MAX:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
26
Switch on all Instagrid ONE units
• Power up the Instagrid ONE units Once the units are powered up, Insta-
grid LINK MAX automatically monitors the correct voltage and phase
• Use the LED displays to check whether all Instagrid ONE units are con-
nected with the Instagrid LINK MAX
• Observe the chapter Errors and Alarms should any errors occur
Section
6.3)
Connect a switched-off consumer to the output socket
• Ensure that the current consumption of the consumer does not exceed 16
A per phase
• Switch on the consumer The device now supplies a stable 400 V AC,
3-phase output
Important: If you notice any abnormal noises or repeated triggering of the
internal circuit breaker, switch off the system and examine the cause
Section
6.3.) Only continue once the problem has been solved
(see Section
6.2.)
(see
(see

Werbung

loading

Diese Anleitung auch für:

990-00008