Herunterladen Diese Seite drucken

alpha innotec EasyPACK ECO Nias THAEQI 270-10 Bedienungsanleitung Seite 77

Wärmepumpen mit lueftgekuehlter verfluessigung und axialventilatoren

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Special maintenance
These are all those repairs or replacements which allow the unit to keep on working in standard conditions. The spare parts must be identical to the previous
ones. Namely, they must have equivalent performance, dimensions etc. according to the specifications provided by the manufacturer.
IMPORTANT!
Maintenance is reserved exclusively for skilled personnel from workshops authorised, qualified to operate on this type of products.
Pay close attention to the danger signs on the unit. Use the personal protective equipment foreseen by current laws. Pay the utmost
attention to the symbols located on the unit. Use EXCLUSIVELY original spare parts.
Special precautions for R32 circuits
Remove any flammable materials or sources of ignition near the unit. Arrange suitable fire extinguishing media (powder extinguisher). Ensure plenty of
ventilation in the work area (also using fans). Arrange gas detectors suitable for R32 refrigerant that can report any gas leaks. Make sure the relative signs
are displayed, such as "No smoking", "No entry", etc.
R32 gas removal procedure
➢ Discharge the refrigerant;
➢ flush the circuit with nitrogen;
➢ evacuate the circuit;
➢ flush again with nitrogen;
➢ open the circuit.
IMPORTANT!
Carefully follow the requirements of 378-4.
Instructions on how to drain the cooling circuit
In order to drain the cooling circuit completely by means of type-approved devices, drain the refrigerant fluid from both the high and low-pressure sides and
in the liquid line. Use the load connections in every section of the circuit. In order to drain the refrigerant fluid completely all the circuit lines must be drained.
The fluid must not be discharged into the atmosphere as it causes pollution. It should be recovered in suitable cylinders and delivered to a company author-
ised for the collection.
Control
Electrical system
Check the power consumption of the unit
Check electrical control board contactors
Fans
Electric motor of fans
Checking gas charge and humidity in circuit (with unit
running at full capacity)
Check that there are no gas leaks
Verify operation of maximum pressure switches
Bleeding air from the chilled water system
Draining the water system (if necessary)
H5xxxxx
77
Frequency
Every 6 months
Every 6 months
In the case of installation with
harsh operating conditions, in-
crease the frequency of the
control.
Every 6 months
Every 6 months
In the case of installation with
harsh operating conditions, in-
crease the frequency of the
control.
Every 6 months
In the case of installation with
harsh operating conditions, in-
crease the frequency of the
control.
Every 6 months
Every 6 months
Every 6 months
Every 6 months
EasyPACK ECO - Nias
Notes
Besides checking the various electrical devices, the electrical in-
sulation of all the cables and their correct tightening on the termi-
nal boards must be verified, paying special attention to the earth
connections.
This operation must be carried out by skilled personnel of author-
ised workshops, qualified to operate on this type of products.
Make sure the motors and fan blades are clean and that there are
no abnormal vibrations.
The motor must be kept clean with no traces of dust, filth, oil or
other impurities. These could cause it to overheat due to low heat
dissipation.
The bearings are usually watertight with permanent lubrication
and sized in order to last approximately 20.000 hours in standard
operational and environmental conditions.
This operation must be carried out by skilled personnel of author-
ised workshops, qualified to operate on this type of products.
If the unit is idle during winter months, it must be emptied. In alter-
native, a glycol mixture can be used according to the information
provided in this manual.
77

Werbung

loading