Herunterladen Diese Seite drucken

Foot End Fastener Part Replacement Schedule - Stryker Performance-PRO XT Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Performance-PRO XT:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 175
Regular inspection and adjustments (Continued)
Item
Kickstand (optional)
Every 12 months or 24 hours
Inspect these items every 12 months or 24 hours, whichever comes first.
Item
Settings
Manual backup release handle
Litter
Base
Wheels
Retractable head section oxygen bottle holder (optional)
Defibrillator platform (optional)

Foot end fastener part replacement schedule

For Performance-LOAD compatible cots, you must replace the foot end fastener parts every 18,078 calls. This is to
make sure that the Performance-LOAD remains functional. Follow this call volume time table to remain compliant with
this requirement.
Calls per day
≤ 7
10
www.stryker.com
Preventive maintenance
8
9
6086-209-005 REV G
Inspect
Grip bar has no excessive damage or tears
Load wheels are secure and roll
Lubricate the kickstand spring and internal spring housing
(optional) using Tri-Flow® lubrication.
Inspect
Cot and fastener fit and function
Safety bar connects to the vehicle safety hook
Returns to the stowed position
All welds are intact, not cracked, or broken
Warning labels present, legible
Fowler bumper and screws
All welds are intact, not cracked, or broken
Check and adjust wheel locks
Straps and clips for wear
Straps not frayed or torn
Latch hooks are intact and secure
Months
Not applicable
77
67
59
English
EN
1-51

Quicklinks ausblenden:

Werbung

loading