Information for service staff
12/2021
3.5
Test run/Commissioning
Are the front and rear panels mounted?
Has it been filled with sufficient water?
If daily operation will be more than 1 hour at maximum pressure: has a
cooling system been attached?
Is the heating connected up?
Are you sure that there are no leaks coming from the tank or pump?
If all questions were answered with 'Yes', then you can start the test run or
operate the unit.
–
Switching the unit on – see operating instructions.
The test run and commissioning of the device will only work if the front
and rear panels are fitted as the safety circuit is otherwise not closed.
NOTE:
Further information may be found in the operating instruc-
tions, chapter "1.5.5 Commissioning".
3.6
Maintenance
Remount any protective devices (e.g. safety switch) after completing work.
WARNING!
Use only genuine spare parts of the same type! The use
of other parts voids the CE conformity! Any liability is
excluded in the case of damage or injury proven to be the
result of the use of non-genuine spare parts.
Installation instructions 13/90