Herunterladen Inhalt Inhalt Diese Seite drucken

Sharp VC-M23SM Servicehandbuch Seite 26

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2. Mounting the shifter (on the back. of the
1. Make.sure that the loading gear is. at.the,point,@ as.shown
below.
2. Place the shifter in position, keeping in mind the 6 insertion
points and the three relief points.
Drum
3. For the phase matching
af the insertion point @, see the point
mechanism chassis).
Capstan
@ as shown below.
peat.
acd
b.D. Motor
4. Finally fix the shifter with two washers located on insert points
@ and@.
Reel Pulley
|
f
se
(Bottom Side of mechanism chassis)
Figure 4-41.
Phase-Matching
.
Point@_
Loading gear (T}
Insert
Cut Washer
Point @
_-;.
LX-WZ1041GE00
|
ae
ac
_
Inset
t
Point@
Cut Washer
LX-WZ1073GE00
Release
Point@
Neer
Point @®
Release
Point @
Point @
Phase-Matching.
Point ©
Figure 4-42.
26

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vc-m231smVc-m43smVc-m431sm

Inhaltsverzeichnis