Herunterladen Inhalt Inhalt Diese Seite drucken

Sharp VC-M23SM Servicehandbuch Seite 24

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ASSEMBLE
THE
MECHANISM'S:.PARTS-
.
|
:
:
:
REQUIRING
THE PHASE MATCHING IN THE'
5
+
STEPS BELOW,
1,,Assembling
the pinch roller assembly, reverse guide
assembly and the pinch drive cam (on the front of the
mechanism chassis).
dy Bod
2.. Mounting the shifter (on the back of the mechanism,
chassis).
.
.
a:
3. Mounting the master cam (on the back of the mechanism.
chassis).
4. Mounting the connection gear, slow brake and loading.
motor assemblies (on the back of the mechanism chas-
sis).
Assembling the pinch roller assembly,.
reverse guide assembly and the pinch drive:
cam (onthe front of the mechanism chassis).
Place the following parts in position in numericdl'order.
=
=~
(1) Reverse drive lever ©
(2) Reverse guide spring @
(3) Reverse guide lever ass'y @
(4) F/G adjusting nut ®
(5) Pinch drive cam'@
(6) Pinch roller ass'y ©
(7) Open lever @
om
i]
Align here.
Figure 4-39.
Turn the reverse guide lever
assembly counterclockwise
to the stopper.
Insert the pinch drive cam,
aligning its notch to the
projection on the pinch
drive lever assembly.
insert the pinch drive lever assembly,
aligning its notch to the projection
on the chassis.
Pinch drive lever ass'y
Figure 4-40-1,
24

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vc-m231smVc-m43smVc-m431sm

Inhaltsverzeichnis