Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection Mb4P - Optimum Opti mill MB 4P Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ATTENTION!
Destruction of the pump due dry running. The pump is lubricated by the cooling
lubricant. Do not start up the pump without cooling lubricant.
INFORMATION
Use a water-soluble environmentally friendly
emulsion as cooling lubricant procured from a
specialist retailer. Make sure that the cooling
lubricant is properly absorbed. Respect the
environment when disposing of lubricants and
coolants. Follow the manufacturer's disposal
instructions.
Img.3-3:
Reverse side of machine base
INFORMATION
The drilling-milling machine is lacquered with a
one-component
paint. Take this criterion into
account when selecting your cooling lubricant.
The company Optimum Maschinen Germany GmbH does not assume any guarantee for sub-
sequent damages due to unsuitable cooling lubricants.
The flashpoint of the emulsion must be higher than 140°C.
When using non-water-miscible cooling lubricants (oil content > 15%) with a flashpoint, ignitable
aerosol air mixtures might develop. There is a potential danger of explosion.
3.5

Electrical connection MB4P

CAUTION!
Must only be worked on by a qualified electrician or person working under the
instructions and supervision of a qualified electrician. Arrange the machine's connection
cable in such a way that it will not cause a tripping hazard.
Ensure that all 3 phases (L1, L2, L3) and the ground wire are connected correctly.
The neutral conductor (N) of its power supply is not connected.
400V three - phase connection, correct direction of rotation, observe phase sequence!
If necessary, two phase connectors at the three phase current switch or at the connection in the
control cabinet must be exchanged. The guarantee will become null and void if the machine is
connected incorrectly.
Please check that the type of current, voltage and protection fuse correspond to the values
specified. A protective earth ground wire connection must be available.
Main Fuse 16A.
MB4P ǀ MB4PV
EN
Version 1.1.8 - 2021-7-29
Translation of original instructions
85

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Opti mill mb 4pv333846033384653338466

Inhaltsverzeichnis