Herunterladen Inhalt Inhalt Diese Seite drucken

Ingeteam INGECON SUN String Control 320 Handbuch Für Montage Und Betrieb Seite 54

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
Ingeteam
5.
Put the cover in place.
6.
Attach the plastic fasteners that are inserted in the cover.
7.
Check that the unit is properly secured.
Once the unit has been installed correctly, a node number must be allocated.
After said configuration, it should be connected in the following order of connection.
1.
Ground connection.
2.
Connection of the communication accessories.
3.
Connection of the inverter.
4.
Connection of the PV array.
It is mandatory to follow the order described above. Do not switch on the power until you have made
all the connections and the unit is closed.
54
AAS2011IQM01_ - Installation and usage manual
Installing the unit

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ingecon sun string control 160

Inhaltsverzeichnis