TABLE OF CONTENTS
7.7
PREPARING FOR MEASUREMENTS
After completing the run-out procedure (Para. 7.6), the vehicle must be prepared for the measurements.
The following screen will appear:
1
3
Unlock the front plates and any rear footboards.
1
Brake the wheels with the handbrake and lock the brake pedal with the appropriate tool (this is necessary if steering in order
2
to correctly calculate the camber and caster angles).
Settle the front and rear part of the vehicle. This operation is necessary if the vehicle has been previously lifted with suspension
3
release (e.g.: run-out with wheels lifted).
7.8
VEHICLE ALIGNMENT / DIRECT MEASUREMENTS
Once the vehicle has been prepared for measurements (Para. 7.7), the following screen appears.
Tap this key to go back to the run-out procedure (Para. 7.6).
Tap this key to continue to the alignment procedure (Para. 7.8).
ROT.R51HD - SPA.BA6HD - RAV.TD600
2
Front wheel alignment
level display.
Processing status.
2015-M364-0
EN-33