Adjusting the dispensing/ejection timing
When the plant falls into the ploughshare (C), the ejector
(B) should be in the rear position and should then start
pushing the plant to eject it.
C
UN41-0897UA
Proceed as outlined below.
1) Take out the lock pin (A).
2) Remove the mobile guard (D).
3) Loosen the screws (E).
4) Turn the dispenser clockwise to speed up the ejec-
tor's pushing action or rotate the dispenser anticlock-
Adjusting the planting unit load
The adjustment unit is usually mounted
in position (A2).
With the unit in position (A2) the weight
on the packing wheels can be increased.
With the unit in position (A1) the weight
on the packing wheels can be reduced.
The unit (B) enables to increase or de-
crease the weight applied by the unit (A)
to the packing wheels.
The weight (load) to be applied to the
packing wheels is obtained by the com-
bined action of the adjustment units (A)
and (B).
Proceed as outlined below.
As regards the position of the adjustment
unit (A), turn the handwheel (C) and the
handwheel (D) to apply the ideal weight
to the packing wheels.
- Carry out the same procedure to adjust
the other planting units installed.
English language
ADJUSTMENT INFORMATION
If the conditions allow high- or low-speed planting, cor-
rect timing between the dispenser and the ejector can
be maintained by adjusting the dispenser.
E
B
wise to delay the pushing action.
5) Tighten the screws (E).
6) Place the mobile guard (D).
7) Insert the lock pin (A).
- Carry out the same procedure to adjust the other
planting units installed.
A1
UN41-0898UA
16
A
D
A2
C
A
D
B
5