Herunterladen Inhalt Inhalt Diese Seite drucken

B) Installing The Main Landing Gear - Reely SKY Jet Liner Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

b) Installing the main landing gear

Glue the wooden bearing blocks (1) for the landing gear into the provided cut-
out (2) using 5-minute epoxy glue.
The notches of the parts must always point backwards.
Figure 18a
Hook the bent linkage rod (1) into the landing gear leg (2).
Attach the landing gear leg using the provided attachment screws as shown in
figure 18b.
Figure 18b
46

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis