3.3.2 Load suspension point

WARNING!
Danger of crushing and overturning. Proceed carefully when lifting, installing and
assembling the machine.
Fix the load lifting gear around the drilling-milling head. Use a lifting sling for this purpose.
Firmly clamp all clamping levers on the drilling-milling machine before lifting the milling
machine.
Make sure that the load attachment does not cause damage to components or paint.

3.3.3 Assembly

Check if the floor under the milling machine is level using a spirit level.
Check that the foundation has sufficient floor-load capacity and rigidity.
ATTENTION!
Insufficient rigidity of the substructure leads to interaction of vibrations between the
milling machine and the substructure (natural frequency of the components). If there is
insufficient rigidity of the system as a whole, critical speeds and unpleasant vibrations
in the axis are achieved rapidly and lead to poor milling results.
Place the milling machine on the designated foundation.
Fix the machine base to the floor/foundation with the provided through-holes.
WARNING!
The condition of the foundation and the method of securing the machine base to the
floor must be performed in a way that it can bear the loads of the milling machine. The
underground must be level. Ensure that the foundation of the milling machine is level
using a spirit level.
Fix the machine base of the milling machine to the foundation with the provided through-holes.
We recommend that you use shear connector cartridges or heavy-duty anchors.
Version 1.0.1 dated 2015-12-17
Original operating instructions
OPTIMUM
M A S C H I N E N - G E R M A N Y
MH25SV
GB
Page 69

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

333 8160

Inhaltsverzeichnis