Herunterladen Diese Seite drucken

RK Rose+Krieger RK MonoLine R Montageanleitung Seite 116

Lineareinheit
Vorschau ausblenden Andere Handbücher für RK MonoLine R:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Maintenance and troubleshooting
After maintenance and troubleshooting
6.4 Fault table
Fault description
High noise production
Guide shafts are cor-
roded and dirty
Timing belt is overstret-
ched
6.5 After maintenance and troubleshooting
Linear unit RK MonoLine R/RK MonoLine Z/RK MonoLine Z corrosion-protected
116
Cause
Grooved ball bearing in the
pulley box is damaged
Rollers are damaged
Timing belt is worn
Normal operating noises
from the polyurethane
timing belt
Insufficient lubrication
Timing belt is overloaded,
e.g. due to a blockage
Perform the following steps once maintenance and troubleshooting
are complete:
1.
Check that all screw connections loosened previously are
secure.
2.
Ensure that all tools, materials and other equipment used
have been removed from the work area.
3.
Clean the work area and remove any escaped substances
such as liquids, processing material or similar products.
Remedy
Replace the grooved ball bearing.
Replace rollers.
Replace the timing belt.
Treat timing belt with lubricating
spray.
Contact RK Rose+Krieger GmbH.
Contact RK Rose+Krieger GmbH.
Personnel
Assembly staff
Assembly staff
Assembly staff
Assembly staff
Assembly staff
Assembly staff
27.10.2023

Werbung

loading