Herunterladen Diese Seite drucken

RK Rose+Krieger RK MonoLine R Montageanleitung Seite 105

Lineareinheit
Vorschau ausblenden Andere Handbücher für RK MonoLine R:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.4.2.2
Assembling the synchronisation shaft (with protective tube)
Applicable to
Assembling the intermediate plate
Fig. 27: Assembling the intermediate
plate
Linear unit RK MonoLine R/RK MonoLine Z/RK MonoLine Z corrosion-protected
27.10.2023
Assembling optional modules > Assembling the synchronisation shaft
Size
Screw size
40
M3
60, 80
M6
120
M8
ð The synchronisation shaft is assembled.
Version
RK MonoLine Z, Z
Size
40/60/80/120
Personnel:
Protective equipment:
Prerequisites:
n
The electric gear unit and/or motor (if available) are secured
against restarting.
n
Linear units to be connected must be fixed in the substrate.
The synchronisation shaft for the RK MonoLine Z
60, Z 80 and Z 80
because it does not have to be equipped with an
intermediate plate.
1.
Place the intermediate plate (Fig. 27/1) on the pulley box
(Fig. 27/2) of both linear units.
2.
Tighten 4 screws each (Fig. 27/3), alternating diagonally:
Size
Screw size
40
M5
120
M8
Tightening torque [Nm]
1.4
10.5
25
n
Assembly staff
n
Protective clothing
n
Protective gloves
Safety shoes
n
does not require the first step
Tightening torque [Nm]
4
25
Assembly
105

Werbung

loading