Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Drawing Dh 26Gt │ Dh 28Gs; Assembly Drawing Of The Dh 32Gs; First Commissioning - Optimum OPTidrill DH 26GT Betriebsanleitung

Getriebebohrmaschine
Inhaltsverzeichnis

Werbung

3.4.1
Assembly drawing DH 26GT │ DH 28GS
Img.3-4:
Assembly drawing DH 28 GS
3.4.2

Assembly drawing of the DH 32GS

Img.3-5:
Assembly drawing of the DH 32 GS
3.5

First commissioning

ATTENTION!
Before commissioning the machine, check all screws, fixtures and/or safety devices and
tighten up the screws if necessary!
Version 1.2.9 - 2021-09-28
Attachment (2)
Attachment (3)
Translation of original instruction
DH26GT | DH28GS | DH32GS
EN
93

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis