Herunterladen Inhalt Inhalt Diese Seite drucken

Complete Proving Program - Gram BAKER GA 930 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für BAKER GA 930:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35

Complete proving program

• Press P once. "ChiL" is shown in the display (the first green lamp lights up).
• Set the required chilling temperature by pressing
• Press P once.
• Set the required chilling time by pressing
• Press P once. "Stor" is shown in the display (the second green lamp lights
up).
• Set the required storage temperature by pressing
• Press P once. "rEtA" is shown in the display (the yellow lamp lights up).
• Set the required retarding temperature by pressing
• Press P once.
• Set the required relative humidity by pressing
• Press P once.
• Set the required retarding time by pressing
• Press P once. "Pro" is shown in the display (the red lamp lights up).
• Set the required proving temperature by pressing
• Press P once.
• Set the relative humidity required during proving by pressing
• Press P once.
• Set the required proving time by pressing
• Press P once. "End" is shown in the display (the red lamp lights up).
• Set the process end time by pressing
• Press P once.
• Set the process end day by pressing
• Press and hold S for 3 seconds to start the process.
40
30
20
10
0
-10
-20
Temperature curve for complete proving program.
765041282
+
or
+
or
.
+
or
+
or
+
or
.
+
or
.
+
or
+
or
.
+
or
.
+
or
.
.
.
.
.
+
or
.
29

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis