Herunterladen Inhalt Inhalt Diese Seite drucken

ECOLAB EMP KKS E60 Bedienungsanleitung Seite 190

Vorschau ausblenden Andere Handbücher für EMP KKS E60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Upgrading the EMP KKS E60 to the EMP KKS E60PLUS
8.2.3.2 Installing the metering lock
NOTICE!
The metering lock function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input "pulse") or 3+4
(input "metering lock") should be used for the metering monitoring input
Ä Chapter 10.3.15 'Configuration / Batch' on page 93).
(
Fig. 31: Installing the metering lock
3 + 4 = Input metering monitoring with potential-free contact, with selection
„metering lock" at configuration metering monitoring (
10.3.7 'Configuration / Metering lock' on page 75).
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3 + 4 = Input metering monitoring with electronic switch (NPN) with selection
input „metering lock" at configuration metering monitoring (
10.3.7 'Configuration / Metering lock' on page 75).
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
417101442 Rev. 12-02.2019
Ä Chapter
54
Ä Chapter

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Emp kks e60plus

Inhaltsverzeichnis