Herunterladen Inhalt Inhalt Diese Seite drucken

Ups Internal Battery Connection - Eaton Powerware 9125 Installationsanleitung

Vorschau ausblenden Andere Handbücher für Powerware 9125:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

INSTALLATION
Table 10. Right Rail Kit (39J4830)
Quantity
Eaton PN
1
157605899-002
1
157605899-003
1
157605900-001
3
180400027-400
3
180500165-001
3
180500230-001

UPS Internal Battery Connection

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
To ensure proper battery operation before installing the UPS:
1.
2.
3.
4
EATON Powerware
Description
Right Fixed Mounting Rail Assembly
Rear Support Rail
Rear Hold-Down Bracket
#10 Split Lock Washer
#10-32 Wing Nut
#10 Flat Washer
Verify that the UPS is off and unplugged.
Remove the UPS front cover (see Figure 1).
Figure 1. Removing Packing Material
Connect the internal battery connector (see Figure 2).
Figure 2. Connecting the Internal Battery Connector
®
9125 (9910-P30) UPS Installation Guide for IBM
®
S
Applications
164201636 Rev A

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

9910-p30

Inhaltsverzeichnis