Herunterladen Diese Seite drucken

HUPFER Kohler BKW1/14 L-GN Betriebsanleitung Seite 54

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Chapter 5
Page 22
Leave the appliance connected to the mains after it has been loaded until the operating temperature
is reached again. The control lamp on the switch panel switches off when the temperature is reached.
Step 4: Moving
Switch off the banquet trolley on the On/Off switch rotary knob with thermostat. For this, turn the ro-
tary knob to the left.
Pull out the mains plug and insert it into the plug park provided on the banquet trolley or wind it onto
the thermal module.
Release the total brakes.
Push or pull the banquet trolley to the destination place.
Apply both total brakes and make sure they are locked and the banquet trolley cannot be moved.
Connect the banquet trolley to the mains.
Step 5: Unloading
WARNING
Select the temperature range using the On/Off switch rotary knob with thermostat and switch the
heating back on. For this, turn the rotary knob to the right.
We recommend a temperature of approx. 203°F (95 °C). Set to the maximum level about 10 minutes
prior to serving meal and keep this setting until the end of serving.
Proceed with serving as quickly as possible.
If you are supposed to interrupt the serving procedure, close the door immediately!
5.2.2
Neutral banquet trolley
Step 1: Loading
Put gastronorm containers or portioned meals on grids into the banquet trolley.
Step 2: Moving
Release the total brakes.
Push or pull the banquet trolley to the destination place.
Apply both total brakes and make sure they are locked and the banquet trolley cannot be moved.
Step 3: Unloading
Proceed with serving. If you are supposed to interrupt the serving procedure, close the door.
Banquet trolley heated | neutral
BKW1/14 L-GN | BKW1/20 L-GN | BKW1/36 B-GN | BKW1/14 L-GN+5PK | BKW1/28 B-GN+10PK | BKW1/23 L-GN
Danger of escaping steam
Hot steam can escape when opening the door. Risk of burning.
Please stay at a safe distance and wait until the steam has volatilised.
Operation
Operation
91101983_A3

Werbung

loading