Hydraulic connections
Connect the cold water supply line and the outlet line to the
appropriate connection points (fig. 58).
The table below gives the characteristics of the connection
points.
Ref.
Function
1
Cold water inlet
2 *
Solar coil outlet
3 *
Solar coil inlet
4
Recirculation
5
Hot water outlet
6
Condensate drain
Pit for solar probe and thermal cut-out
A *
bulb
B
Magnesium anode
*: only for 200 LT-S and 260 LT-S models.
6
B
4
3
2
EN
180
EGEA TECH
Model 200 l / 260 l
1"G
3/4"G
3/4"G
3/4"G
1"G
1/2"G
1/2"G
-
5
A
1
fig. 58
cod. 3540000410 - Rev. 03 - 09/2023
200 LT - 260 LT -200 LT-S - 260 LT-S
For the correct operation of the
device, the inlet water pressure
must be:
ATTENTION
- maximum 0.7 MPa (7 bar);
- minimum 0.15 MPa (1.5 bar).
For the correct operation of the
device, it is essential to install a
0.7 MPa safety unit (7 bar, light
OBLIGATION
series supplied as standard) on
the cold water inlet. Use only
connecting pipes (not supplied),
rigid and resistant to electrolysis
both at the inlet of cold water and
at the outlet of hot water from the
device.
Water can drip from the dis-
charge pipe of the overpres-
sure device; leave this pipe
ATTENTION
open to the atmosphere.
The decompression device
must be operated regularly
to remove limescale depos-
its and to check that it is not
blocked.
Connect a rubber hose to the
condensate drain, taking care
not to force too much so as
not to break the drain hose
itself.

Werbung

loading