EGEA TECH
4.8
RESIDUAL RISKS
The design was carried out in order to ensure the essential
safety requirements for the operator in charge and for the end
user.
As far as possible, safety has been integrated into the design
and construction of the device; however, there are still risks
from which operators must be protected.
Risk
Definition
RISK DUE TO ELECTRICITY.
Machine access and maintenance op-
erations expose operators to risk due to
ELECTRICAL
electricity.
HAZARD
Work on live equipment must only be
carried out by expert and qualified per-
sonnel. The following safety measures
are recommended:
• do not carry out maintenance work
without having previously discon-
nected the device from electricity;
5.
HANDLING AND TRANSPORT
Permitted positions for transport and handling
200 LT - 260 LT -200 LT-S - 260 LT-S
cod. 3540000410 - Rev. 03 - 09/2023
During the handling and instal-
lation phases of the product, the
upper part must not undergo any
ATTENZIONE
type of stress, given that it is not
supported by any structure.
Position allowed only for the last km
Positions not permitted for transport and handling
fig. 39
EN
169