Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Preliminary Operations; Before Commissioning; Parameter Setting And Display - Sime UNIQA REVOLUTION 25 Installations-, Gebrauchs- Und Wartungsanleitung

Kombiheizgerät mit heizkessel
Vorschau ausblenden Andere Handbücher für UNIQA REVOLUTION 25:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7

COMMISSIONING

7.1

Preliminary operations

a
WARNING
– Should it be necessary to access the areas in the
bottom part of the appliance, make sure that the
system components and pipes are not hot (risk of
burning).
– Before replenishing the heating system, put on pro-
tective gloves.
Before commissioning the appliance, check that:
– the type of gas is correct for the appliance
– the gas isolation valves for the heating system and the water
system are open
– the pump impeller rotates freely.
7.2

Before commissioning

After having carried out the preliminary operations, perform the
following to start the boiler:
– set the main system switch to "ON"
ON
– the type of gas for which the boiler has been calibrated, "nG"
(methane) or "LG" (LPG,) will appear followed by the power.
After this the correct representation of the symbols will be
checked and finally "- -" will appear on the display
– check that the system pressure as shown on the pressure
gauge when the system is cold , is between 1 and 1.2 bar
– press the button
y
once for at least 1 second to select
"SUMMER mode"
l
. the value of the delivery sensor detect-
ed at that moment will appear on the display
– open one or more than one hot water tap. The boiler will work
at maximum power until the taps are closed.
– if there is a fault, the message "ALL" will appear on the dis-
play, the fault code (eg. "06" - no flame detected) and the mes-
sage
d
m
CAUTION
To restore the start conditions press and hold the but-
ton
y
be carried out no more than 6 times.
– close the taps opened previously and check that the appliance
shuts down
– press the button
"WINTER mode"
ture detected at that moment will appear on the display
Fig. 41
– adjust the air thermostat and check that the boiler starts and
operates correctly.
7.3

Parameter setting and display

To go into the parameter menu:
– from the selected mode (eg. WINTER)
– press the buttons
the same time until "PAR 01" (parameter number) and the val-
ue set (0÷4) appears on the display
.
for more than 3 seconds. This operation can
Y
once for at least 1 second to select
n
. The value of the heating water tempera-
r
and
t
(for approximately 5 seconds) at
33

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis