Commissioning and operation
Operation > Automatic mode
8.2
Commissioning: control unit DryExxEco
To be able to carry out the setup process for the technical control system, it is
essential to observe the instructions given in
control
Ä Chapter 9.3 „Initial Configuration" on page 51 must be observed!
1.
Determine the position.
2.
DryExxEco
6.3 „Assembly of the control unit (switch cabinet) DryExxEco
ETH" on page 37 .
3.
Install the power supply and lines for the enabling signals.
4.
Perform the wiring of the DryExxEco
5.
Carry out the cabling of the section valves.
6.
Following commissioning of the DryExx®
DryExx®" on page 44 switch on the entire system.
7.
Carry out the parameterisation in accordance with the section situation.
8.
Enter the parameters for each section into the control.
9.
Perform a system test with external enabling signal.
10. Perform a system test with internal enabling signal.
8.2.1

System parameterisation

1.
Set valve assignment according to the site conditions.
2.
Enter the parameters for each selection valve.
8.3

Operation

Personnel:
8.3.1

Automatic mode

When the tasks under
completed, the control can be set to automatic mode.
If a production signal is generated by the system, the lubrication circuits are activated at
the set times and then shut down sequentially.
Rev. 02-09.2017
®
Advanced-ETH" on page 49 . In particular, the information under
®
Assemble the Advanced-ETH as described in
n
Operator
n
Specialist
n
Trained personnel
Ä Chapter 8.1.1 „Filling the pipe system" on page 45 have been
®
Advanced-ETH
Ä Chapter 9 „DryExxEco
®
Advanced-ETH to the DryExx®.
Ä Chapter 8.1 „Commissioning: