Assembly
6
Assembly
Personnel:
®
The DryExx
connection and wall mounting on delivery.
WARNING!
The applicator stations should only be operated with a DryExx
also receive their power supply from this unit.
NOTICE!
Material damage by using incorrect tools!
Material damage may arise by using incorrect tools during assembly,
maintenance or troubleshooting. Only use the correct tools.
Setup, assembly and commissioning is only permitted to be carried out by specialist
personnel who must be trained for this type of work.
n
Use the construction data for the building to check whether or not the mounting points
(wall mounting) are designed for the load.
n
The required energy sources (e.g. power, water, air) should be prepared in advance or
prepared as far as possible.
For the assembly work, use the bolts and fastening elements included in the delivery,
n
or use appropriate fittings.
NOTICE!
For operation of the DryExx
around the plant (recommendation: approx. 100 cm).
For connection, repair and maintenance work, a minimum of 100 cm space is
required around the plant
For servicing work on the electrical switch cabinet (control), the space
requirement of approx. 150 cm is recommended.
Check that all components in the electrical and control cabinets are securely
fitted. Tighten all bolts and clamps.
Rev. 02-09.2017
n
Manufacturer
n
Qualified electrician
n
Mechanic
applicator stations are pre-assembled by the manufacturer and are ready for
®
system, a minimum of 50 cm space is required
34
®