Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning The Valve System - Aventics AES Serie Systembeschreibung

Vorschau ausblenden Andere Handbücher für AES Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
AVENTICS | AES I/O Modules, Analog | R412018147–BAL–001–AG
114

Commissioning the Valve System

7
Commissioning the Valve System
Before commissioning the system, the following steps must have been carried out and completed:
You have assembled the valve system with bus coupler (see the assembly instructions for the
bus couplers and I/O modules, as well as the valve system).
You have made presettings and configured the system (see the system description for the
relevant bus coupler on the included CD R412018133).
You have connected the bus coupler to the controller (see AV valve system assembly
instructions).
You have configured the controller so that it actuates the valves and the I/O modules correctly.
Commissioning and operation may only be carried out by qualified electrical or pneumatics
personnel or an instructed person under the direction and supervision of qualified personnel
(see "Personnel qualifications" on page 73).
Danger of explosion with no impact protection!
Mechanical damage, e.g. strain on the pneumatic or electrical connectors, will lead to
non-compliance with the IP65 protection class.
In explosive environments, make sure that the equipment is installed in a manner that
protects it from all types of mechanical damage.
Danger of explosion due to damaged housings!
Damaged housings can lead to an explosion in explosive areas.
Make sure that the valve system components are only operated with completely assembled
and intact housing.
Danger of explosion due to missing seals and plugs!
Liquids and foreign objects could penetrate and destroy the device.
Make sure that the seals are integrated in the connections and not damaged.
Make sure that all connections are mounted before starting the system.
Risk of uncontrolled movements when switching on the system!
There is a danger of personal injury if the system is in an undefined state.
Put the system in a safe state before switching it on.
Make sure that no personnel are within the hazardous zone when the compressed air supply
is switched on.
1. Switch on the operating voltage.
The controller sends parameters and configuration data to the bus coupler, electronic
components in the valve zone, and I/O modules during startup.
2. After the initialization phase, check the LED states on all modules (see "8 LED Diagnosis on the
I/O Modules" on page 115 and the system description for the respective bus coupler on the
included CD R412018133).
If the diagnostic run is successful, you may commission the valve system. Otherwise, the errors
must be remedied (see "Troubleshooting" on page 121).
3. Switch on the compressed air supply.
DANGER
CAUTION

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis