EQUIPMENT NECESSARY FOR INSTALLATION
Depending upon model, use the batteries and cables on the output terminals as specifi ed in the following table:
MODEL
Battery voltage
Battery capacity
Minimum output cable size
Number of battery cells
The cables connected to the output terminals have a maximum length of 4 metres (with single battery charger).
MODEL
Battery voltage
Battery capacity
Minimum output cable size
(battery charger-junction "J")
Minimum output cable size
(junction "J" - battery)
Number of battery cells
MODEL
Battery voltage
Battery capacity
Minimum output cable size
(battery charger-junction "J")
Minimum output cable size
(junction "J" - battery)
Number of battery cells
Regarding the lengths of the output cables with several battery chargers connected in parallel, refer to the diagram in figure 2C.
WARNING: the battery charger must be used only with re-chargeable lead/liquid electrolytic batteries or
lead/gel (sealed or non-sealed).

INSTALLATION SITE

Install the battery charger in a dry, ventilated place
and as near to the batteries as possible. The bat-
tery charger, although having high efficiency, devel-
ops a certain amount of heat during use, therefore,
it is imperative that the installation area has suffi-
cient ventilation, enough to allow use of the equip-
ment at maximum power.
The battery charger can be installed in a horizontal
or vertical position with cables coming out in the
downward position.
The battery charger must be fi xed to the support
surface with screws strong enough to support its
weight.
The vertical position is recommended because the
natural convection of heat helps to cool the equip-
ment. The perimeter of the battery charger (except
the base) must be kept at a distance from walls or
objects by a minimum of 5 cm.
SBC ADVANCED PLUS HI-POWER - REV004A
CHARACTERISTICS AND INSTALLATION
SBC 1100 ADV PLUS FR
12 V
360 ÷ 800 Ah
35 mm
2
6
SBC 1100 ADV PLUS FR
2 units in parallel
12 V
720 ÷ 1600 Ah
35 mm
2
70 mm
2
6
SBC 1100 ADV PLUS FR
3 units in parallel
12 V
1080 ÷ 2400 Ah
35 mm
2
120 mm
2
6
SCB 1450 ADV PLUS
24 V
270 ÷ 600 Ah
25 mm
2
12
SCB 1450 ADV PLUS
2 units in parallel
24 V
540 ÷ 1200 Ah
25 mm
2
50 mm
2
12
SCB 1450 ADV PLUS
3 units in parallel
24 V
810 ÷ 1800 Ah
25 mm
2
95 mm
2
12
PART. B
GB
SBC 1950 ADV PLUS
360 ÷ 800 Ah
35 mm
2
12
SBC 1950 ADV PLUS
2 units in parallel
720 ÷ 1600 Ah
35 mm
2
70 mm
2
12
SBC 1950 ADV PLUS
3 units in parallel
1080 ÷ 2400 Ah
35 mm
2
120 mm
2
12