Operation
6. Open both snap hooks (from the lifting tube
corset) (Fig. 6) and hook them further up on the
lifting tube corset (Fig. 7).
52220015 / 52220015 -150 / 52220015-200 / 52220015-250
Fig. 6
7. Lifting hose is now released for work
26 / 40
Fig. 7
GB