Herunterladen Diese Seite drucken

probst TM-D-A Betriebsanleitung Seite 103

Vorschau ausblenden Andere Handbücher für TM-D-A:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

O
O
P
E
R
A
T
I
O
N
A
N
D
M
P
E
R
A
T
I
O
N
A
N
D
M
4. Turn the sprocket (7) in reverse, pushing
the bottom of the track inside the chassis
(8).
5. Using a steel tube, position the track and
turn the sprocket again.
6. Make sure that the links of the track are
correctly meshed on the cogwheel and the
idler roller.
7. Adjust the tension of the track (see para‐
graph 5.4.2 ‐ Operations for loosening/tighte‐
ning the track).
8. Rest the tracked undercarriage on the ground.
5.4 CHECKING THE TIGHTNESS OF NUTS AND BOLTS
The parts and the nuts and bolts that may become loose must be checked based on
the use of the forklift.
Pay special care to the components of the chassis, such as the idler rollers, travel
reduction gears, sprockets and guide rollers. Check tightness as per the fol‐
lowing table.
Thread diameter
38
A
I
N
T
E
N
A
N
C
E
M
A
N
A
I
N
T
E
N
A
N
C
E
M
A
N
mm
6
8
10
12
14
16
18
20
22
24
27
30
U
A
L
U
A
L
Distance between
idler roller and
sprocket
mm
1
1,25
1,5
1,75
2
2
2,5
2,5
2,5
3
3
3,5
7
5 2
0 2
0 2
B H
1 9
8
kgm
1,3 ±
0,15
3,2 ±
0,3
6,5 ±
0,6
11
±
1
17,5 ±
2
27
±
3
37
±
4
53
±
6
73
±
8
92
± 10
135
± 15
184
± 20
MUTP2000171893021216
TP2000

Werbung

loading