Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Checking The 5-Axle Clamp; Lubricating The 5-Axle Clamp - Rohm RVM Originalbetriebsanleitung

5-achs-spanner mit backenschnellwechsel
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9 | Maintenance

9
Maintenance
Maintenance task
Check the 5-axle clamp for deforma-
tions, fractures, cracks, signs of
wear, corrosion and loose parts
(screws, components) (visual inspec-
tion)

Lubricating the 5-axle clamp

9.1

Checking the 5-axle clamp

Pre-conditions:
▪ Personnel qualification: Trained/instructed person
▪ Wear personal protective equipment
▪ The machine is switched off and protected against being switched on
again
▪ The machine and 5-axle clamp have cooled down
▪ Machine and 5-axle clamp are cleaned
Procedure:
Ÿ Check the 5-axle clamp for deformations, fractures, cracks, signs of
wear, corrosion and loose parts.
9.2
Lubricating the 5-axle clamp
Pre-conditions:
▪ Personnel qualification: Trained/instructed person
▪ Wear personal protective equipment
▪ The machine is switched off and protected against being switched on
again
▪ The machine and 5-axle clamp have cooled down
▪ Machine and 5-axle clamp are cleaned
84 / 88
Interval (hours of operation or
after incident)
120 h or at least 1x weekly
120 h or at least 1x weekly
RVM DE-EN

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis