Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA CPH6000 Betriebsanleitung Seite 35

Vorschau ausblenden Andere Handbücher für CPH6000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Commissioning, operation
Optional delay time [sec]
1
Input via numeric input keypad and confirmation with [ENTER].
With the entry of such a delay time, the acceptance/recording of the test point is blocked for
this duration.
In the example shown, after the first test point has been recorded, 30 seconds must pass
before the second test point can be recorded.
Should all test points need to be cleared or reset, since the new calibration
consists of fewer test points than the previous test series, press the [CLEAR]
button. This will clear and reset the current and all subsequent test points.
(This process can take several seconds.)
Should all saved calibration data for all calibrations need to be cleared at a
single time, see chapter 6.9.7 "CLEAR CalProg".
WIKA operating instructions, pressure calibrator model CPH6000
M1
M2
Fig. 1 - Calibration cycle in accordance with DKD guideline 6-1
Z
2 minutes
30 s
30 s
For tube pressure
gauges: 5 minutes
Readings
..Calibration
Calibration:
Testitem:
4-20 mA
ID no:
123456
Tag no:
456789
R.-Start:
Range-End:
Unit:
Class:
Pressuretype:
Medium:
PowerSupply:
Testpoint:
Hold time:
Set:
True:
Calibration program
EN
1
0.000
6.000
bar
0.50
%FS
rel
Gas
24V
2
1
30
0.00000
0.00000
35

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis