Herunterladen Inhalt Inhalt Diese Seite drucken

BestWater Jungbrunnen 66-10 Gebrauchsanleitung Seite 79

Vorschau ausblenden Andere Handbücher für Jungbrunnen 66-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Flushing the membranes
Membrane fl ushing then begins, during
which the jelly-like disinfectant is remo-
ved from the membranes and directed
into the drain. This process can take up
to 3 minutes.
Membrane sinse
ESC <-
Rinse permeate:
With the rinsing of the ultrapure water
JUNGBRUNNEN
side of the membranes, the energising
stages and the after-fi lters, the start-up
66-10/11
has been successfully completed (stored
by the control unit).
Permeat rinse
ESC <-
The "Permeate production" programme
is started automatically and shown in the
top line of the display. If the draw-off tap
is open, permeate is permeate is produ-
ced immediately.
If the draw-off tap is closed, the control
unit switches to standby mode. (standby
mode).
Permeat production
device ready
ESC <-
Permeat production
device in operation
ESC <-
00078%
00059%
Initial commissioning
We recommend that you keep the per-
meate for the permeate for the fi rst 7
- 10 minutes after minutes after com-
missioning, in order to to fl ush out any
remaining disinfection residues.
During the initial commissioning, please
check all hoses for their position and their
leakage tightness. The hoses must not
be bent or damaged!
EN
79

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für BestWater Jungbrunnen 66-10

Diese Anleitung auch für:

Jungbrunnen 66-11

Inhaltsverzeichnis