Initial commissioning
EN
The commissioning
After each new installation and each fi l-
ter change, commissioning is necessary.
The fi lters and membranes are fl ushed.
Diff erent data on fl ushing times, opera-
ting sequences and states are stored in
the system control, which makes it possi-
ble to realise and register the necessary
sequences.
The IC
programme
programme) contains a diff erent pro-
gramme sequence with longer, non-
adjustable fl ushing times for fi lters and
JUNGBRUNNEN
membranes.
66-10/11
This operating mode requires that the
BestWater system is correctly installed
and connected. After each new pro-
gramme step, the connections must be
immediately checked for leaks.
The water supply and the tap must
be open. This is the only way commis-
sioning can be carried out correctly.
Open the water supply at the corner valve
Turn on the designer faucet
78
Normally, the IC programme should be
preset at the factory. If this is not the
case, proceed as follows.
Navigate with the (+) or (-) key. To activa-
te the IB programme, press the
(commissioning

Programme sequence:

After starting the IB programme with the
OK key, the appliance is fi lled with water.
The fi lling date is saved. It can be viewed
in IB date.
Rinse pre-fi lter:
When the minimum pressure is reached,
the fl ush valve for the pre-fi lters opens.
First the granulate of the activated car-
bon pre-fi lter is rinsed.
This removes any abrasion that might
occur during transport and sends it to
the drain.
This procedure protects other compo-
nents in the system.
Select operating
mode with
"+" or "-" key
IC-Program
ESC <-
-> OK
Filter rinse
ESC <-
00030%
OK
key.