Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Drawings; First Commissioning - Optimum OPTIdrill B 34H Betriebsanleitung

Säulenbohrmaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.4.1 Installation drawings

B34H
140
B34HV
140
4.5

First commissioning

ATTENTION!
Before commissioning the machine check all screws, fixtures resp. safety devices and
tighten up the screws if necessary!
WARNING!
Risk by using improper tool holders or operating them at inadmissible speeds.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Assembly
Version 1.1.3 - 2020-07-21
14
25
150
268
98
637
Abb.4-11: B34H
472
150
14
25
80
644
Abb.4-12: B34HV
Translation of the original instructions
Fixing 2x
Fixing 3x
B34H | B34HV
GB
93

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Optidrill b 34hv30203333020335

Inhaltsverzeichnis