Herunterladen Inhalt Inhalt Diese Seite drucken

Putting Into Operation And Setup - pyrexx PX-IC Betriebsanleitung

Vorschau ausblenden Andere Handbücher für PX-IC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

(6) To ensure a safe hold of the device,
tighten the screw deep into the
dowel so that it closes flush with the
magnetic carrier.
Also in a drilling installation, you
can create an adhesive com-
pound using additional adhesive
film, according to vfdb 14/01 (Q)
(see chapter "Adhesive mount-
ing according to EN 14604:2005/
AC:2008 and vfdb 14/01 (Q)" on
page 62).
(7) Take the device into operation and
set it up.
f Observe chapter 6 "Putting into
operation and setup" on page 64.
(8) Put the device on the magnetic
carrier.
5 Magnetic carrier is attached and the
device is placed.
64
Operating Manual: PX-1C - Smoke Alarm Device with Radio Link
6
Putting into
operation and setup
Always consider the following when put-
ting into operation and setting up the
smoke alarm device:
f Take devices in a radio group in
operation and set up individually, one
after another and in close proximity
to the installation location.
f To avoid overlay of the radio signals
when putting into operation, keep
a minimum distance of 2 to 3 m
between the individual devices.
f After putting the device into oper-
ation, the splint pin is used as a tool
for operating the radio button, and
must be kept readily available in the
vicinity of the device.
6.1 Set up radio group
The first device placed into service is
Master, and manages the installation of a
radio group.
EN
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis