Herunterladen Inhalt Inhalt Diese Seite drucken

pyrexx PX-IC Betriebsanleitung Seite 63

Vorschau ausblenden Andere Handbücher für PX-IC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

(2) Take the device into operation and
set it up.
f Observe chapter 6 "Putting into
operation and setup" on page 64.
(3) Attach additional adhesive film to
the magnetic carrier sheet plate on
the device.
f Remove the protective film on one
side of the adhesive sheet.
f Put adhesive sheet on the magnetic
carrier sheet plate on the device and
press on.
f Remove the protective film on the
other side.
(4) Put the device on the magnetic
carrier and press on.
5 The device is mounted on the
magnetic carrier.
5.2 Drilling installation
As an alternative to adhesive mounting,
you can also screw the magnetic carrier
on the mounting surface.
Even with the drilling installation, the ad-
hesive pad must remain on the magnetic
carrier and must not be removed.
EN
EN
Operating Manual: PX-1C - Smoke Alarm Device with Radio Link
When performing the drilling installation,
proceed as follows:
(1) Remove magnetic carrier from
the device.
f To do this, tilt the magnetic carrier.
(2) Drill a hole on the mounting posi-
tion in the mounting surface.
(3) Insert the dowel into the drill hole.
(4) Tighten the screw in the
magnetic carrier.
(5) Position the magnetic carrier above
the dowel.
CAUTION
Possible property damage!
Over-tightening the screw may deform
the magnetic carrier.
f Tighten the screw only so deep
that the magnetic carrier is not
deformed or bulged.
63

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis